October 24, 2026

Planning a Double-Speed Chain Assembly Line

Jushi Automation Assembly Lines Category

Build around the assembly sequence

A differential-speed chain line supports pallet-based movement between assembly and processing stations. Start with the workstation sequence and how the product is supported.

Confirm the line configuration

The Jushi presentation lists line width, drive length, conveying speed and frame material as project configuration items. Dimensions and performance must be checked against the actual load and production needs.

Include testing requirements early

Where powered testing is required, conductive wheels and pallet conductor rails can be discussed during technical review. Confirm electrical requirements, controls and guarding before finalising the design.